I don't need to, um I watch. So everything also not just for drain, but also there needs to be air venting through for your drainage as well, so that water travels correctly. So so when you create a plumbing plan will go to the city site and find out what is actually required. And the washer says go here toe washer. The flashing should extend at least two courses of shingles above the soil pipe. So that's pretty much it. Either the picture itself would would have a reducing branch to it, or you'd have a piece that connects. So so then the cold water line. We will need the hot and cold there. And we only have two fixtures over here for the hot water, so this one inch is gonna branch. Please let me know what you thought, and I will see you next time. The teacher's recommendation is shown until at least 5 student responses are collected. I have been working in the Architectural Field for over 20 years. And what I'm gonna do now isn't really go ahead. And this is by layer. So this is where the our water supply is coming from. When a house is to have a poured-concrete-slab floor, all waste lines running through the floor must be installed before the concrete is poured. That's part of that job. They're going to know the best way to run things the best, Um, way to save the the amount of pipes they're running. You may go to four inches, but for the most part three inches. Come 3/4 supply here, and it's gonna come up half an inch of their So here this happens from here on, we can leave it 1/2 inch cause it's only supplying to pictures over here. The sink over here is one the water closet, the tub shower and the sink. We have our bathroom here in our kitchen. H. Wise & Co. New York, 1950. Um, so it actually be, And I were going to fix is right now. The magenta is 1.5 inch, and the blue is three inch so, so typical. Things to know before starting Plan: Okay, So before we get started, let's go over some general things about creating a plumbing plan. You don't want something turning this direction, and then something turn in that direction. The ice maker only needs a cold. Open a new drawing page: . I'm sure you have to create a water supply plan and a drainage plan. We'll go to feet at an angle of 45 just to show that there is a dream coming off of that, and I believe that is about it. Um, which that's what This is a P trap, and it's going to go to the Santee again. If the drain must discharge into the sewer line, the drain should be fitted with a deep-seal trap. You know, as a standard, your washer is going to be two inches. Two inches. Okay, so that looks good. This is our tub shower. And this is just some of things I had already mentioned about clearly labeling on your plan that the plumbing contractor is responsible to make sure everything's is is installed correctly and that everything is adhering to the applicable codes. Introduction to Residential Architect Plumbing Plans: Hello, everyone. You will find that installing the fresh water system is a simple business compared to the drainage system. And I believe I have some text years. And OK, so we have our or toilet here, and we have, ah, sanitary tea or Santee Connection. Students should have a intermediate knowledge of Autocad for this course. Let's try this again. So here, this would be the inlet to our shut off, so we'll have a shut off over here and what I like to do Teoh to show that it's going vertical is I'm going to draw a line at a 45 degree angle and, um, let's go ahead and match properties again. I'm not showing here, but you would have a cross type picture that would have it would connect all these different sizes and you have a three inch vent through the roof, and then you see, it just continues over here to our to our sink, and the sink is going. And then when it breaks off here to the water heater. So for items like this, um, the ice maker that does not require a drainage. So, um, that's basically what we will be doing for our water and drain lines. So now let's go ahead and move on. Or see these sections of Chapter 13 - PLUMBING SYSTEM INSTALLATION. So so, then are cold. Um, this should be sufficient for any contractors. Um, way we could give him some general dimensions for for the lengths after running um, but But again, you may or may not want to do this, because you just you just never know exactly how they're going to run it. Now this direction is incorrect. The top openings should be packed with something to prevent concrete or debris from falling into the line. New members: get your first 7 days of Skillshare Premium for free! If your first floor is made of wood, the first thing you should do is to make the openings in the floor of the bathroom and kitchen so that waste lines to the fixtures can be brought in.